Effective dates for MPT and SAT

FAR

Case Number: 2002-003

Type of rule: Interim; finalized without change on 10/1/2003

Effective Date: 8/30/2002

Archive Effective Date: 2002-08-30

FAR Case Information:

Temporary Emergency Procurement Authority
67 FR 56120 AUG 30, 2002, FAC 2001-09

MPT:

Updated the definition for the following statutory exceptions:
(1) $2,000 for construction subject to the Davis-Bacon Act; and
(2) $15,000 for acquisitions by or for the DoD facilitating the defense against terrorism or biological or chemical attack as described in 13.201(g), except for construction subject to the Davis-Bacon Act.

SAT:

Updated the definition for the following statutory exceptions:
Except that in the case of any contract to be awarded and performed, or purchase to be made—
(1) Outside the United States in support of a contingency operation (as defined in 10 U.S.C. 101(a)(13)) or a humanitarian or peacekeeping operation (as defined in 10 U.S.C. 2302(8) and 41 U.S.C. 259(d)), the term means $200,000; or
(2) To facilitate the defense against terrorism or biological or chemical attack against the United States, for acquisitions—
(i) Inside the United States, by or for the DoD, for which award is made and funds are obligated on or before September 30, 2003, in support of a contingency operation (as defined in 10 U.S.C. 101(a)(13)), the term means $250,000; or
(ii) Outside the United States, by or for the DoD, for which award is made and funds are obligated on or before September 30, 2003, in support of a contingency operation (as defined in 10 U.S.C. 101(a)(13)), the term means $500,000.