AIR FORCE FAR SUPPLEMENT
PART 5336 — Construction and Architect-Engineer Contracts
Table of Contents
SUBPART 5336.2 — SPECIAL ASPECTS OF CONTRACTING FOR CONSTRUCTION
5336.208 Concurrent Performance of Firm-Fixed-Price and Other Types of Construction Contracts
5336.209 Construction Contracts with Architect-Engineer Firms
5336.213-2 Presolicitation Notices
5336.272 Prequalification of Sources
SUBPART 5336.3 — TWO-PHASE DESIGN-BUILD SELECTION PROCEDURES
5336.301 Use of Two-Phase Design-Build Selection Procedures
SUBPART 5336.5 — CONTRACT CLAUSES
5336.507 Permits and Responsibilities
5336.570 Additional Provisions and Clauses
SUBPART 5336.6 —ARCHITECT-ENGINEER SERVICES
5336.602-3 Evaluation Board Functions
See MP5301.601(a)(i).
Submit requests through the SCO to SAF/AQC for approval.
(a) See MP5301.601(a)(i).
(b) See MP5301.601(a)(i).
(b)(3)(vi) See MP5301.601(a)(i).
(a)(4)(i)(B)See MP5301.601(a)(i).
When the clause at FAR 52.236-7, Permits and Responsibilities, is used in solicitations and contracts OCONUS, the clause must be modified to reflect host government and political subdivisions in lieu of Federal, State, and Municipal.
(b)(2) See MP5301.601(a)(i).
See MP5301.601(a)(i).
(c)(1) See MP5301.601(a)(i).
See AF PGI 5336.9001.
See AF PGI 5336.9002.
2019
Edition 5336-