Skip to main content

2011-018

Submitted by Anonymous (not verified) on Wed, 05/06/2020 - 14:11
Effective dates for MPT and SAT

FAR

Case Number: 2011-018

Type of rule: Final

Effective Date: 5/29/2014

Archive Effective Date: 2014-05-29

FAR Case Information:

Positive Law Codification of Title 41
79 FR 24192 APR 29, 2014, FAC 2005-73

MPT:

Updated the citation of an existing statutory exception—
(1) For acquisitions of construction subject to 40 U.S.C. chapter 31, subchapter IV, Wage Rate Requirements (Construction), $2,000;
(2) For acquisitions of services subject to 41 U.S.C. chapter 67, Service Contract Labor Standards, $2,500; and
(3) For acquisitions of supplies or services that, as determined by the head of the agency, are to be used to support a contingency operation or to facilitate defense against or recovery from nuclear, biological, chemical or radiological attack as described in 13.201(g)(1), except for construction subject to 40 U.S.C. chapter 31, subchapter IV, Wage Rate Requirements (Construction) (41 U.S.C. 1903)—
(i) $15,000 in the case of any contract to be awarded and performed, or purchase to be made, inside the United States; and
(ii) $30,000 in the case of any contract to be awarded and performed, or purchase to be made, outside the United States.

SAT:

Updated the citation of an existing statutory exception at the intoductory paragraph—
Except for acquisitions of supplies or services that, as determined by the head of the agency, are to be used to support a contingency operation or to facilitate defense against or recovery from nuclear, biological, chemical, or radiological attack (41 U.S.C. 1903), the term means—