19.809 Preaward considerations. 19.809-1 Preaward survey. 19.809-2 Limitations on subcontracting and nonmanufacturer rule. Parent topic: Subpart 19.8 - Contracting with the Small Business Administration (The 8(a) Program)
19.809 Preaward considerations. 19.809-1 Preaward survey. 19.809-2 Limitations on subcontracting and nonmanufacturer rule. Parent topic: Subpart 19.8 - Contracting with the Small Business Administration (The 8(a) Program)